JT-500KW Cummins Generator

  • 12-Month Warranty
  • Factory Direct Price
  • Fast Global Shipping
  • 24/7 WhatsApp Support

PRP: 500 kW / 625 kVA

Standby: 550 kW / 687.5 kVA

Engine: NTA855-GA

Free consultation:
Product Overview

JT‑500KW Cummins Industrial Generator | 500kW Prime Power for Construction & Industrial

500 kW Prime / 625 kVA · 550 kW Standby / 687.5 kVA | Cummins NTA855‑GA 6‑Cylinder | 400/230V 50Hz | ISO9001 · CE · SONCAP · PVoC

Overview ▾

JT‑500KW delivers 500kW prime from a single NTA855‑GA inline‑6 — no paralleling required for most mid‑sized industrial projects. 550L tank sized for an 8‑hour construction shift, 500‑hour maintenance interval, IP23 protection.

Applications

JT‑500KW 625kVA Cummins generator with CE SONCAP PVoC certification for construction industrial infrastructure power

· Construction Site Power
· Medium‑Scale Factory
· Quarry & Stone Processing
· Regional Hospital Backup
· Commercial Complex
· Telecom Base Station
· Agricultural Processing Plant

Specifications

ModelJT‑500KW
Prime / Standby Power500 kW / 625 kVA · 550 kW / 687.5 kVA
Voltage / Frequency400/230V · 50 Hz
Rated Current900 A
EngineCummins NTA855‑GA, 6‑Cyl In‑Line Turbocharged, 18.9L
Bore × Stroke / Compression159 mm × 159 mm · 15.5:1
Speed / Peak Torque1,500 RPM · 1,630 N·m @1500RPM
Cooling / Engine OilWater‑Cooled · 38 L
AlternatorBrushless, Self‑exciting, H‑Class, 3‑Phase
Phase / Power Factor3‑Phase 4‑Wire · 0.8 (lagging)
THD / Protection<5% · IP23
Fuel Consumption168‑176 (50%) / 184‑192 (75%) / 202‑210 (100%) g/kW·h
Fuel Tank / Runtime550 L · ≈7‑hr @ 75% Load
Maintenance Interval500 Working Hours
Noise Level80‑82 dB(A) @ 1m
Max Altitude (No Derate)≤ 1,000 m
Max Parallel UnitsUp to 8 Units (IEC 8528‑5)
ATS CompatibilityYes
Dimensions / Weight4,800 × 1,900 × 2,400 mm · 6.8 t
CertificationsISO9001 · CE · SONCAP · PVoC · NRCS · SIRIM · SNI · TISI
Lead Time / Payment30‑35 work days + 40‑50 days ocean freight · 30% advance, 70% before shipment

Core Advantages

1. 500kW — Single Unit Covers 80% of Mid‑Sized Industrial Projects ▾

Most medium‑scale factories, construction sites and processing plants need between 300‑600kW. At 500kW prime, one JT‑500KW covers the full demand without paralleling. For projects expanding from 300kW, this is the point where adding a second generator becomes unnecessary.

2. Inline‑6 vs V12 at 500kW — Why the NTA855‑GA Makes Economic Sense ▾

At 500kW, you can use a V12 engine (like the KTA19‑G3 derated) or an inline‑6 (NTA855‑GA). We use the inline‑6 because it has fewer cylinders, simpler maintenance, lower rebuild cost and better fuel efficiency at partial loads. For sites where 500kW is the final target (not an intermediate step to 800kW), inline‑6 is the more economical architecture.

3. 18.9L Displacement — Lower Fuel Consumption Under Full Load ▾

The NTA855‑GA's 18.9L displacement means each cylinder displaces 3.15L — larger than the 2.5‑3.0L per cylinder typical of smaller engines asked to deliver 500kW. Larger displacement at this power level means lower brake‑specific fuel consumption because the engine does not need to be pushed to high BMEP to deliver rated power. Result: 202‑210 g/kW·h at full load vs 210‑218 g/kW·h for smaller‑displacement 500kW units (Cummins NTA855 series datasheet).

4. 550L Tank — Sized for an 8‑Hour Construction Shift ▾

The 550L fuel tank provides approximately 7‑8 hours at 75% load — matching the standard 8‑hour construction shift in most markets. For construction sites where fuel delivery is weekly (not daily), this tank size means one refill per week for typical usage patterns. If your site runs 24‑hour operations, factor in a secondary bulk tank rather than expecting one generator tank to cover 24 hours.

5. 500‑Hour Maintenance — Matches Construction Site Usage Patterns ▾

Construction sites move every 1‑2 years. Mining sites stay for 10‑20 years. For construction, the 500‑hour maintenance interval (Cummins NTA855 series datasheet) means approximately one service every 2‑3 months for a site running 8 hours/day. This is infrequent enough to avoid disrupting project schedules, but frequent enough to catch issues before they become failures. For construction contractors who are not running 24‑hour operations, this interval matches your actual usage pattern.

Get a Custom Quote

· Factory‑direct pricing, custom solutions and global technical support available.
· Request datasheets, quotations and certification documents now.
· Response within 1‑2 business days.

Company Profile

Shandong Jutop Heavy Industry Technology Co., Ltd. is a national high-tech heavy machinery manufacturer founded in 2013. Equipped with a 50,000㎡ workshop and over 300 professionals, we specialize in R&D and export of construction machinery, drilling rigs and generators. Boasting 200+ patents and global certifications, our products are exported to over 120 countries, dedicated to supplying reliable cost-effective equipment for worldwide clients.

Certificate

Request a Quote
Submit your questions via the form below for a response within 1 business day.
Recommended Products

Contact Us

Submit your questions via the form below for a response within 1 business day.